We had a frame walk through today. Walls outside of the house were already done. Wires and tubes inside the house were still exposed. Purpose of the walk through was just to show us where the electric outlets, wires and tubes were and if they were where we specified them to be.
Next walk through is pre-carpet. By that time, everything is installed except the carpet. So excited! That would be by end of August.
Closing date will be mid - September. I pray this will be done without any hitch. With all that is happening right now, I need a miracle. A BIG miracle!